Will data captured on an interim run/s be included with the main run when a report is generated based on Runs for the specified period?

Will data captured on an interim run/s be included with the main run when a report is generated based on Runs for the specified period?

This applies to all PaySpace editions.

Ensure that the interim run/s are linked to the correct main run when it is created, so that all data captured will be detailed in the report generated.

      Navigate > Payroll Cycle > Payslip Pay Dates